Returning Home

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Move-in Information for Marshall Fire Rebuild Residents

Connect Services 

Lumen/Quantum Fiber: https://www.quantumfiber.com/

United States Postal Service, Louisville Post Office: 80027LouisvilleCo@usps.gov; 303.665.0030

Xcel Energy: https://www.xcelenergymarshallfirerecovery.com/

Link to Application for Gas and Electric Services

Xfinity/Comast: Daniel Cruz, dan_cruz@comcast.com; 720.597.6177

Town of Superior Utility Billing: Town-wide water service; trash and recycling services for: Original Town, Sagamore, The Ridge, Coal Creek Crossing, Downtown Superior, Calmante, Lanterns, Montmere at Autrey Shores and Rogers Farm. utilitybilling@superiorcolorado.gov; 720.304.6797

Fence Information

  • Fence Requirements per Superior Municipal Code
  • Sagamore Fence Regulations: Residents of Sagamore may elect to either install or not install a fence on their respective properties. For those who elect to install a fence, the fence must be non-combustible material. The previously prescribed fence typologies have been eliminated. Fence types will largely be at the property owner's discretion; however, both municipal and building code requirements for fencing shall apply.

Landscaping

 Colorado State University Extension - Low-Flammability Landscape Plants (Disclaimer: This document is intended to be informational only, and its contents are neither prescribed nor endorsed by the Town. Where applicable, residents must receive metro district or HOA approval before implementing landscaping designs.)

Lumen Fiber Installation in Sagamore

Lumen/Century Link is in the process of installing high-speed fiber communication lines in Sagamore. This work is generally being completed within the rear lot utility easements throughout Sagamore. Lumen has subcontracted this work to Pauley Construction, LCC, who is currently performing conduit installations via directional drill, which will include excavation work within the rear lot utility easements.

This phase of work is scheduled to last two more weeks, at which time the contractor will begin setting utility boxes and pulling the new fiber lines through the newly installed conduits.

If you have questions about this project or need more information, you can reach Lumen directly by contacting the Program Manager, Andy Devine at (720) 331-6091 or andy.devine@lumen.com.